CDCS New Dumps Pdf - CDCS Latest Exam Guide
How to find a valid exam dumps providers which can elaborate on how to prepare you properly with more appropriate questions to pass CDCS exams? Yes, here is your chance to know us. Our products are just suitable for you. Our CDCS exam training dumps will help you master the real test and prepare well for your exam. If you worry about your exam, our CDCS Exam Training dumps will guide you and make you well preparing,you will pass exam without any doubt.
EXIN CDCS Exam Syllabus Topics:
Topic
Details
Topic 1
- Data Centre Life Cycle and Standards: This section of the exam measures the skills of data center professionals and covers the various stages involved in the life cycle of a data center, from planning and design to implementation and decommissioning.
Topic 2
- Designing and Implementing a Data Centre: In this module, the exam assesses the knowledge of Exin data center professionals tasked with the design and implementation of data centers. Candidates will learn the key principles of creating an efficient data center layout, including considerations for scalability, redundancy, and security.
Topic 3
- Data Centre Environmental Considerations and Efficiency: This section evaluates the proficiency of data center professionals in addressing environmental factors and promoting efficiency within data center operations. The target audience, including data center managers and engineers, will be tested on their ability to identify and implement measures that enhance energy efficiency, cooling management, and sustainable practices.
CDCS Latest Exam Guide - High CDCS Passing Score
With the rapid development of the world economy and frequent contacts between different countries, the talent competition is increasing day by day, and the employment pressure is also increasing day by day. If you want to get a better job and relieve your employment pressure, it is essential for you to get the CDCS Certification. However, due to the severe employment situation, more and more people have been crazy for passing the CDCS exam by taking examinations, and our CDCS exam questions can help you pass the CDCS exam in the shortest time with a high score.
EXIN EPI Certified Data Centre Specialist Sample Questions (Q51-Q56):
NEW QUESTION # 51
The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room.
Is this a good practice from an early smoke detection point of view?
- A. Yes, as this reduces the amount of piping to be installed in the data center, as all air will go through the air conditioner.
- B. No, the piping should be installed at the air exhaust of the air conditioner, as there can also be a fire inside the air conditioner itself.
- C. No, it will give a longer reaction time for the smoke detection system and there might also be bypass airflow.
- D. It depends on the type of gas-based fire suppression which will be installed.
Answer: C
Explanation:
For optimal early smoke detection in a data center, it is crucial that the Very Early Smoke Detection Apparatus (VESDA) system be installed at locations where smoke will be detected as soon as it appears. Positioning the VESDA pipes at the air intake of the air conditioner inside the computer room is not ideal. This placement could result in a delayed detection response and the potential for bypass airflow to occur, which would impede the system's ability to detect smoke effectively.
Detailed Explanation:
When VESDA pipes are installed at the air intake, the detection system relies on the smoke to be drawn into the air conditioning unit before detection can occur. This setup increases the reaction time as the smoke has to travel through the intake and get processed by the air conditioner. Furthermore, bypass airflow-a phenomenon where not all the air containing smoke particles passes through the VESDA pipes-could also delay or even prevent the system from detecting smoke early.
Ideally, VESDA pipes should be positioned where smoke is likely to accumulate first, such as near the ceiling or in the return airflow path to detect smoke at the earliest possible stage. This ensures that the detection system can quickly trigger alarms, providing more time to address potential fire hazards.
EPI Data Center Specialist References:
EPI Data Center Specialist training highlights that smoke detection should prioritize early response capabilities to maximize safety. The preferred installation for VESDA pipes is generally at points where smoke would naturally accumulate, rather than relying on air conditioning intakes where airflow can vary and delay detection. In their course materials, EPI emphasizes minimizing reaction time and reducing the impact of airflow dynamics on smoke detection efficiency.
NEW QUESTION # 52
The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?
- A. There are no regulations regarding noise levels inside a building. Regulations only apply to noise pollution outside of the building.
- B. As long as the data is compliant to ISO/IEC 27001 it is acceptable.
- C. Yes, since it is mandated by regulations.
- D. No, anything less than 100 dB (A) is acceptable.
Answer: C
Explanation:
In a data center with noise levels of 91 dB (A), employers are indeed required to take precautions to protect personnel, as this level exceeds commonly accepted safety thresholds for occupational noise exposure. Regulations, such as those from the Occupational Safety and Health Administration (OSHA) or similar agencies, mandate specific controls and protections for environments with high noise levels.
Detailed Explanation:
Noise levels above 85 dB (A) typically trigger requirements for hearing conservation programs. At 91 dB (A), steps like providing ear protection, conducting regular noise assessments, and possibly implementing engineering controls to reduce noise should be taken. Extended exposure to such levels can lead to hearing loss, so regulatory compliance ensures both immediate and long-term protection for personnel.
EPI Data Center Specialist References:
EPI guidelines for data center safety address noise exposure as part of the environmental safety measures. EPI recommends adhering to local occupational health regulations, as excessive noise can harm personnel and affect operational efficiency due to potential health hazards.
NEW QUESTION # 53
What indicates the breaking capacity of a fuse or breaker?
- A. The current that a fuse or breaker is able to interrupt without being destroyed or causing an electric damaging arc.
- B. The maximum voltage, in case of an electrical surge, that the fuse or breaker can handle without being destroyed or causing an electric damaging arc.
- C. The current at which the device will trip.
- D. Mechanical strength of the casing of a fuse or breaker.
Answer: A
Explanation:
The breaking capacity of a fuse or breaker indicates the maximum current it can safely interrupt without being damaged or creating a dangerous arc. This value is crucial for ensuring that the device can handle fault conditions and prevent equipment damage or fire risks due to excessive current flow.
Detailed Explanation:
The breaking capacity, also known as the interrupting rating, ensures that the fuse or breaker can safely handle fault currents up to a specified limit. Exceeding this capacity could result in the device failing to interrupt the current, potentially causing hazardous conditions like electrical arcs.
EPI Data Center Specialist References:
EPI training underscores the importance of matching fuses and breakers with appropriate breaking capacities for the anticipated fault levels in data centers to ensure reliable and safe operation.
NEW QUESTION # 54
An MCB needs to be installed in the PDU of an air-conditioner unit.
Which breaking curve should you select?
- A. B-Curve
- B. C-Curve
- C. A-Curve
- D. D-Curve
Answer: B
Explanation:
For an MCB (Miniature Circuit Breaker) in the PDU of an air-conditioning unit, a C-Curve is recommended. C-Curve breakers are suitable for circuits with moderate inrush currents, such as those experienced in air conditioning units. They provide protection against overloads while accommodating the inrush without nuisance tripping.
Detailed Explanation:
C-Curve breakers trip when currents exceed 5 to 10 times the rated current, making them ideal for devices like air conditioners that experience moderate inrush currents upon startup. This characteristic provides a balance between protection and resilience against startup surges, preventing unnecessary trips while safeguarding the circuit.
EPI Data Center Specialist References:
EPI guidance for data center electrical systems specifies that C-Curve breakers are appropriate for equipment with inrush characteristics similar to air conditioning units, as they help prevent operational interruptions caused by typical surges during equipment start-up.
NEW QUESTION # 55
You are allowed to use a calculator for this question.
A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.
The temperature is 20 °C / 68 °F.
The required design concentration is 7%.
The S-Factor is 0.1359 (metric) / 1.885 (imperial).
Calculate the amount of gas required for this computer room based on FM200. What is the correct weight?
- A. Approximately 410 kg / 900 lbs
- B. Approximately 820 kg / 1,800 lbs
- C. Approximately 1,390 kg / 3,000 lbs
- D. Approximately 1,640 kg / 3,600 lbs
Answer: B
Explanation:
The amount of FM200 gas required can be calculated using the formula:
Weight of Gas=Net Volume×Design Concentration×S-Factor ext{Weight of Gas} = ext{Net Volume} imes ext{Design Concentration} imes ext{S-Factor}Weight of Gas=Net Volume×Design Concentration×S-Factor Using metric units:
Net Volume: 2,500 m³
Design Concentration: 7% (or 0.07)
S-Factor: 0.1359
Calculation:
2,500 m3×0.07×0.1359=821.325 kg2,500 , ext{m}